Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13625716

- Product Categories
- Friendly Links
Information Name: | Electric wire rope hoist operation, Gansu Electric wire rope hoists, lifting Xinyu |
Published: | 2015-01-08 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Part of the components consisting of wire rope hoist wire rope hoist can be divided into: 1 reduction gear unit 3. 2. drum hoist electric car motors 4. 5. 6. cone brake adjustment nut 7. guide rope 8 The coupling device 10. Control button hook 9. 11. 12. The hollow shaft gear box 13. The ring 14.09 16.05 15.06 gear shaft gear shaft ball bearings 17.04 gear shaft 18. 19. 20. The cover 21 needle roller bearings breathable plug wire rope hoist components including the role and function of each part as follows: reducer: is the use of three fixed shaft helical gear drive mechanism, gears and gear shafts are heat treated alloy steel wire rope hoist, box, cover made from high quality cast iron, tight fitting, well-sealed. Control box: is the use of the main circuit can be cut in case of emergency, and a vertical stroke limiter stage fire protection device with. Rope: is the use of type hoisting rope, which ensures durability. Cone Motor: Lifting motor with a larger dynamic moment conical rotor brake single-speed asynchronous motor wire rope hoist, no additional brake. Button switch: 5 tons of hand-operated type wire rope hoist, wire rope hoist lightweight flexible operation, manipulation of sub-corded and cordless remote control in two ways. Installation wire rope hoist wire rope hoist rope clamp rope clamp installation should pay attention to what the place: 1, "U" shaped bolt should be withheld on the rope tail section (short side), electric hoist wire rope clips should be arranged alternately on a wire ; the distance between the rope clamp for rope diameter of 6-7 times. 2, rope clamp diameter should be referred to the public in accordance with the size of the selection rope clamp rope Department should be smooth, flat, should not have glitches, if the rope clamp deck when there are obvious signs of sliding friction bright attention replacement. 3, fastening rope clip: To ensure the fixed end of the wire rope hoist by force, from the most distant rope wedge clip fastening shall first single, three rope clips should also slowly tightening wedge from recent rope at the folder (the first rope clip) should be as close to the wedge, the rope caught in use for some time, you should periodically check the status of the nut tightened rope hoist operation, Gansu Electric wire rope hoists, lifting from Xinyu clear Yuan Xinyu Hoisting Machinery Limited. Qingyuan Xinyu Crane Co. (xyqz0312.1688.com) strong, credible, Baoding in Hebei engineering, construction crane industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Xinyu lifting and you hand into the brilliant, for a better future! |
Admin>>>
You are the 15410 visitor
Copyright © GuangDong ICP No. 10089450, Qingyuan Xinyu Crane Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15410 visitor
Copyright © GuangDong ICP No. 10089450, Qingyuan Xinyu Crane Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility